Constellation Energy Operator Isn't Worried About Democrats After $2.5 Trillion AI Stock Sell-Off
After the US midterm elections, the market sold off AI-related stocks by a record $2.5 trillion. Many of the Democrats who won had campaigned against data centers. Constellation Energy, the largest owner of nuclear power plants in the country, calls the reaction panic. CEO Joe Dominguez pointed out that construction creates jobs and that unions are a pillar of the Democratic Party. For AI projects, the risk is more local than federal.
AI-processed from The Verge; edited by Hamidun NewsAfter the US midterm elections, the market sold off shares of AI-linked companies by a record $2.5 trillion. The reason is simple: Democrats won majorities in the House of Representatives and the Senate, and many of them ran on platforms opposing data centers.
Investors worried that the new authorities would slow the construction of server farms, without which no model can be trained or run. The decline hit not only tech companies but also energy, construction, and materials suppliers. However, Constellation Energy, the largest operator of nuclear power plants in the US and one of the main electricity suppliers to data centers, does not share the panic.
Its CEO, Joe Dominguez, called the market's reaction "somewhat overdone" on the third-quarter earnings call.
For those building AI products, this is not distant politics. Electricity has become the industry's bottleneck, and where and how quickly new capacity gets connected will determine prices and timelines.
Why Nuclear Operators Came to Depend on AI
Just a few years ago, many of Constellation's reactors were in serious financial trouble, and some could have shut down early because there were not enough customers to keep the plants profitable. The data center boom, with its huge demand for electricity, changed that. Microsoft signed a 20-year agreement with the company and is paying to restart the unit at Three Mile Island in Pennsylvania. That is the site of the 1979 accident, which the US regulator NRC describes as the most serious in the history of the country's commercial nuclear power. In the third quarter, Constellation also signed major contracts with both Amazon and Google.
The arrangement works indirectly. A plant does not have to be next to a data center or in the same state. It only needs to be connected to the same regional grid. A data center consumes more than the local grid can handle without disrupting other users, so it pays an independent generator like Constellation for additional output for the whole network. The deal is largely symbolic, but the money is very real.
The government is also helping the industry. This month, the US Department of Energy approved a $5 billion loan to Constellation for upgrading existing nuclear plants, and Vistra received $4.2 billion. Tax incentives for developers were introduced under both Biden and Trump, and the Trump administration is pushing to reform the NRC so that new reactors can get licenses more easily.
Dominguez's Arguments
He was speaking to investors and has to reassure them, but his arguments are fairly down to earth. First, data centers create construction jobs, and unions are an important pillar of the Democratic Party. Second, in Virginia and Illinois, Democratic governors were in office even before the elections, and construction is active there. Third, by his account, Republicans during the campaign said many of the same things Democrats did, so the resulting policies will look similar. He acknowledges that some districts may not want data centers.
The issue is indeed not strictly partisan. In Virginia, one of the loudest critics remains a Republican, state senator Richard Stuart. Recently, Democratic governor Abigail Spanberger rejected his request for a special session on a report about groundwater shortages, which are being worsened by the expansion of data centers.
What Remains Uncertain
First, legislation. The Senate must vote on a bipartisan bill that promises to speed up permitting for power plants and transmission lines and to connect data centers to the grid faster. Senator Martin Heinrich praises it for protecting consumers from rising rates. But experts at Columbia University call that protection "mixed": it does not account for wholesale capacity and energy prices, and it is through those prices that data center load most often reaches household bills. Democratic senators are assessing the bill in different ways: critics fear it will accelerate projects by cutting public review and environmental oversight.
Second, local resistance. Campaigns against data centers remain fragmented, but they sometimes succeed. Still, developers can move elsewhere: according to the National Conference of State Legislatures, 38 states offer them tax incentives. Meanwhile, the federal government wants to take back some control over construction from the states.
What This Means in Practice
If your AI product depends on large computing capacity, the main risk right now is not a federal ban but local restrictions, electricity tariffs, and water shortages. It is worth looking at regions with spare capacity and budgeting for rising energy costs. And keep in mind: Dominguez is an interested party, and Constellation's future is tied to data center construction. His optimism guarantees nothing. The problem of nuclear waste also remains unsolved: the US still does not know how to dispose of it at scale.
- Nov 21, 2026Хаб Huawei Ascend за пять часов пополнился 26 зеркалами открытых моделей
- Nov 21, 202648 ИИ-агентов «открыли» поселение майя, но учёные описали его год назад
- Nov 21, 2026Anthropic Lists on Nasdaq as Quarterly Revenue Growth Slows from 144% to 47%
- Nov 21, 2026Cambridge Finds a "Blind Spot": 33% of the AI Supply Chain Is Not Mentioned in the Policies of 43 Countries
Key Questions Answered
Why Nuclear Operators Came to Depend on AI?
Just a few years ago, many of Constellation's reactors were in serious financial trouble, and some could have shut down early because there were not enough customers to keep the plants profitable. The data center boom, with its huge demand for electricity, changed that. Microsoft signed a 20-year agreement with the company and is paying to restart the unit at Three Mile Island in Pennsylvania.
What are the key details on Dominguez's Arguments?
He was speaking to investors and has to reassure them, but his arguments are fairly down to earth. First, data centers create construction jobs, and unions are an important pillar of the Democratic Party. Second, in Virginia and Illinois, Democratic governors were in office even before the elections, and construction is active there. Third, by his account, Republicans during the campaign said many of the same things Democrats did, so the resulting policies will look similar.
What Remains Uncertain?
First, legislation. The Senate must vote on a bipartisan bill that promises to speed up permitting for power plants and transmission lines and to connect data centers to the grid faster. Senator Martin Heinrich praises it for protecting consumers from rising rates. But experts at Columbia University call that protection "mixed": it does not account for wholesale capacity and energy prices, and it is through those prices that data center load most often reaches household bills.
Ship AI Faster with Founders, Engineers & Weekly Architecture Reviews
Inside Vibe Club (hamidun.com/club) — weekly live masterminds with Zhemal Khamidun, Tech Radar, full LMS access, and 370+ production Claude Code skills.
The AI world, distilled — once a week
Seven stories that actually mattered, hand-picked. No noise, no reposts, no press releases.
Done! Check your inbox for a confirmation.